Buyer Assurance

Verify the factory behind the quotation

An audit looks beyond the sales conversation. We examine the site, equipment, people, processes and records that determine whether a factory can deliver your product consistently.

Request a factory audit
A quality engineer measures a precision industrial component in a factory
Tolerances are checked where the work happens.
01

Factory audit overview

Factory audit overview begins with the written product and commercial brief. The scope states which documents, records, measurements or site evidence will be checked and which conclusions remain outside the assignment.

02

Initial factory evaluation

For initial factory evaluation, the working standard comes from the purchase requirements, approved references and risks identified before fieldwork. Findings are recorded against that standard rather than the supplier's general assurance.

03

Technical and quality system audit

Technical and quality system audit is kept visible in the report so the buyer can trace each conclusion back to evidence. Missing information and checks that could not be completed are reported alongside confirmed findings.

04

Production capacity

The practical question behind production capacity is agreed before work starts. That keeps photographs, records and factory observations focused on the decision the buyer must make next.

05

Equipment and manufacturing processes

Equipment and manufacturing processes can involve desk research, supplier coordination or work at the operating site. The quotation identifies the method, timing, location and evidence included before the assignment is approved.

06

Quality management systems

A useful review of quality management systems separates observable facts from commercial judgement. SilkVanta documents the first and gives the buyer a clearer basis for the second.

07

Lead time evaluation

Lead time evaluation is planned around the product stage and the time still available for correction. Earlier checks focus on prevention, while later checks support a release, hold or re-inspection decision.

08

Social compliance audits

The result for social compliance audits includes the evidence found, the agreed acceptance reference, relevant limits and the next issue that requires buyer or supplier action.

09

Environmental audits

Environmental audits begins with the written product and commercial brief. The scope states which documents, records, measurements or site evidence will be checked and which conclusions remain outside the assignment.

10

Risk rating and corrective action plan

For risk rating and corrective action plan, the working standard comes from the purchase requirements, approved references and risks identified before fieldwork. Findings are recorded against that standard rather than the supplier's general assurance.

11

Factory audit versus product inspection

Factory audit versus product inspection is kept visible in the report so the buyer can trace each conclusion back to evidence. Missing information and checks that could not be completed are reported alongside confirmed findings.

12

Audit report

The audit report organises site evidence around capability, systems, capacity and risk, then identifies corrective priorities without guaranteeing future performance.

Common questions

Questions worth answering before you start.

Practical answers about factory audit services in china, its scope and the decisions clients need to make before work begins.

01How is a factory audit different from an inspection?

An audit assesses the factory, systems and capability. An inspection checks products or production against defined requirements. Many projects need both at different stages.

02Can the audit cover electronics manufacturing?

Yes. A technical scope can review SMT capability, ESD controls, component traceability, firmware control, calibration, reliability testing and final assembly.

03Do you perform social or environmental audits?

These can be coordinated when the required protocol, auditor qualification and reporting standard are agreed in advance.

Next step

Make the next commitment with better evidence.

Request a factory audit